Building Bright Futures in East Africa

Projects

Choose a project.
Help build it.

Two projects are open for 2027. Pick one, and your whole gift goes into it.

Open now

Next on Samwel's list

Children who board at Sammena, gathered round a bunk bed
2027planned
Electricity and solar

Light to learn by

The children study in the evenings by torch and candlelight, and there's no lighting in the boarding houses.

  • Power connection, wiring and lights
  • Evening study for boarders
  • Computers, admin and security for the school
Raised so far£1,35054 bricks laid · and counting
See the full plan and cost

Lighting, wiring and a power connection for the classrooms and both boarding houses. Planned for 2027, at a total cost of £6,000.

Pupils outside the green primary school building at Sammena
Phase 1open now
Secondary school

Somewhere to go next

Sammena children are taught in English. At secondary school they join classes taught in Swahili until then, and many stall. Drop-out rates are high. A secondary school on the same land keeps them learning, close to home.

  • Classrooms, teachers' offices and laboratories
  • Built in four phases, one a year
Phase 1 raised so far£3,875155 bricks laid · and counting
See the full plan: four phases, 2027 to 2030
Phase 12027£25,000Open for gifts now
Phase 22028£25,000Opens after phase 1
Phase 32029£25,000Opens after phase 2
Phase 42030£28,000The school is complete
Whole secondary school, 2027 to 2030£103,000
Can't choose?Give to wherever Samwel needs it most.Give where it's needed

On the horizon

After school, work

We don't want to educate children and leave them without opportunities. These come next, once we've listened in December.

Built so far

Done, together

2026

Toilets and showers

7 toilets and 11 showers, drawn up by our architect friend Leeza Aldis-Hobbs of AMDesign. Paid for by selling an inlaid table, a family heirloom. The shower water flushes the toilets and waters the fields.

Being built now · £7,000
2025

Perimeter fence

780 metres. It keeps the children in the boarding houses safe, and stops animals wandering in and eating the crops.

Fully funded · £2,650
2024

Second boarding house

We saw up to three children sharing a mattress. Family members paid for a second house, so boys and girls have one each.

Fully funded
2023

Bunk beds and bedding

Beds, mattresses and bedding for 33 boarders. The children chose the sheets.

Fully funded · £1,210
2019

First boarding house

Children had been sleeping in classrooms with dirt floors. Gail's birthday money started the build.

Fully funded
2017

First school toilets

A friend lent us her house for a wedding trip. The rent we'd budgeted built the school's first toilets.

Fully funded · £2,700

Stay in touch

News from Sammena, four times a year

Photos, project progress and what your gifts have built. No spam.